Construction contracts in Spain
1,725 open tenders
Email me new ones
CountryTenderValueClosesDays left
ES€1,250,0001 lot, 1 year
Wed 4 Nov19:00 in Madrid
7days
ES€173,7721 lot, 3 months
Wed 4 Nov19:00 in Madrid
7days
ES€156,4991 lot, 3 months
Wed 4 Nov19:00 in Madrid
7days
ES€92,5621 lot, 6 months
Wed 4 Nov19:00 in Madrid
7days
ES€5,022,1491 lot, 18 months
Wed 4 Nov19:00 in Madrid
7days
ES€67,7261 lot, 4 months
Wed 4 Nov23:50 in Madrid
7days
ES€23,2891 lot
Wed 4 Nov23:55 in Madrid
7days
ESExecution project for the pending revegetation works in the surroundings of the funeral home. It is the will of this city council to act in the area of Avinguda de la Catalana and the descent to the Besós river park between Ronda del Barcelonès and the funeral home, improving accessibility and structuring the green and blue infrastructure. The action foresees that the area will be a “structuring green axis”. The original works began in August 2025 after the signing of the site verification report. Subsequently, the contract was subject to a modification and two extensions, setting the completion date as 22 May 2026. Upon reaching this date, the Site Management confirmed that the works had not been completed, resulting in a breach of contract and the abandonment of the works by the awarded company, a circumstance that motivated the initiation of the contract resolution file. As a consequence of this situation, the Site Management drafted several technical reports in which the following were determined: the final measurements of the units actually executed; the pending units necessary to complete the works and the additional works derived from the degradation, lack of maintenance and abandonment of the work. In accordance with these reports, it is noted that a significant part of the actions foreseen in the original project are already executed (earthworks, gabion walls, part of the pavements, drainage network, irrigation network, plantations, slope stabilization, among others), while the execution of different work units corresponding to paving, lighting, traffic lights, street furniture, signage, protections and various repair and replacement works derived from the time elapsed since the abandonment of the works remains pending. The works project can be consulted at this link: https://nuvol.sant-adria.cat/index.php/s/GNnir2BTgZxJ7jAAjuntament de Sant Adrià de BesòsPLACSP 20701466
€368,9251 lot, 5 months
Wed 4 Nov23:59 in Madrid
7days
ES€66,0431 lot, 4 months
Wed 4 Nov23:59 in Madrid
7days
ES€101,2211 lot, 2 months
Wed 4 Nov23:59 in Madrid
7days
ES€71,5511 lot, 3 months
Wed 4 Nov23:59 in Madrid
7days
ES€211,6451 lot, 3 months
Wed 4 Nov23:59 in Madrid
7days
ES€77,5002 lots, 10 months
Wed 4 Nov23:59 in Madrid
7days
ES€434,0511 lot, 4 months
Wed 4 Nov23:59 in Madrid
7days
ES€251,8201 lot, 3 months
Wed 4 Nov23:59 in Madrid
7days
ES€337,7631 lot, 3 months
Wed 4 Nov23:59 in Madrid
7days
ES€657,5602 lots
Wed 4 Nov23:59 in Madrid
7days
ES€60,7751 lot, 2 months
Wed 4 Nov23:59 in Madrid
7days
ES€432,8391 lot, 6 months
Wed 4 Nov23:59 in Madrid
7days
ES€291,6701 lot, 7 months
Wed 4 Nov23:59 in Madrid
7days