Construction project for the enabling of new rejection basins for the municipal solid waste recovery and composting plant in Gádor Almería: separate document for the waterproofing of a 100m strip, in accordance with the specifications and characteristics set out in these specifications and in the technical project.
Presidencia del Consorcio de Residuos Sólidos del Poniente Almeriense, El EjidoPLACSP 20743845
€819,3701 lot, 5 months
Mon 9 Nov23:59 in Madrid
11days