ESRenovation of a section of 76,60 metres of the sewage and rainwater collector to run mainly inside the plots of Carrer Pinatell and Rovelló in the Can Vila urbanisation, which is collapsed and broken. The renovation action is defined through the reconstruction of the collector from the existing inspection manhole immediately before the plot of Carrer Pinatell, 23 to the first inspection manhole of Carrer Pinatell, 4, incorporating three intermediate manholes justified by the changes in the direction of the pipe layout as a result of the adaptation to the unevenness and existing construction elements.Ajuntament de Sant Antoni de VilamajorPLACSP 20701533€113,5971 lot, 2 monthsWed 4 Nov23:59 in Madrid6days