The planned action aims to stabilize the slope affected by the geotechnical instability detected on Pinetell street, as well as to restore the service and safety conditions of the affected road platform.
Ajuntament de Riells i ViabreaPLACSP 20719472
€71,8461 lot, 2 months
Mon 9 Nov15:00 in Madrid
11days