ESExecution of the works defined in the basic and execution project for the improvement, conditioning and new bathrooms at Passeig Sant Feliu drafted by the municipal Technical Services, which include: 1. Reconditioning of the pedestrian footbridge of 81 m in length (295 m²) between Passeig Sant Feliu and the church of Sant Feliu: replacement of the pavement with class IV autoclave-treated pine wood, sanitation of the metal structure and repair of railings and lighting. 2. Construction of a new volume of public bathrooms of 24,50 m² under the existing metal staircase, with an adapted cabin, and its installations. 3. Paving of a section of 136 linear meters (204 m²) of Passeig Sant Feliu at the entrance to Barruera.Ajuntament de la Vall de BoíPLACSP 20751831€128,7481 lotWed 11 Nov13days