Inspection of the natural gas transmission system Zhidilovo–Skopje and distribution pipeline Skopje South using the in-line method, and inspection of Deve Bair–Zhidilovo (0–4 km) and distribution pipelines Skopje North 1.8 km, Bunardzhik 5.4 km, Kumanovo 7.7 km, Kratovo 4.6 km and Kriva Palanka 1.5 km using NDT methods
Joint Stock Company for performing energy activity natural gas transmission NOMAGAS Skopje in state ownershipTED 738988-2026
value not stated1 lot, 2 years
Mon 23 Nov10:00 in UTC
25days